Check out some of our past and current projects that we are working on.

Questions?  Call us at (302) 436-2611.

 

PROJECTS

Cape Henlopen High School
Cape Henlopen High School

Exterior Framing / Sheathing / Drywall / Stud Interior /Framing / GFRC Panels -- Project lasted 12 months, which also included insulation, exterior framing and metal trusses.

Capital School District Admin. Bldg.
Capital School District Admin. Bldg.

Exterior Framing / Sheathing / Metal Trusses / Interior Wall Framing -- Project lasted nearly 12 months.

Beebe Medical Center
Beebe Medical Center

Numerous projects in and around the main campus and satellite locations. Includes MRI Rooms / CT Scan Rooms / General Contracting, etc. -- K.B. Coldiron, Inc. and Mike White have been working with Beebe for more than 14 years.

Methodist Manor House
Methodist Manor House

Multiple projects including renovations to the interior of the property -- This project is ongoing, and has been active for more than six years.

First State Chevrolet
First State Chevrolet

Exterior Framing / Plywood Sheathing / AVB / ACM Panels / Painting / Acoustical Tiles

Beebe Millsboro Medical Center
Beebe Millsboro Medical Center

Exterior Framing / Sheathing / Wood Trusses / Plywood Sheathing / Interior Framing / Drywall / Acoustical Ceilings

Beebe School of Nursing
Beebe School of Nursing
North Salisbury Elementary School
North Salisbury Elementary School

Exterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Acoustical Ceiling / Fire Proofing -- This project was all-new construction, and lasted approximately 12 months.

Intervet, Inc. Office Building
Intervet, Inc. Office Building

Exterior Framing /Sheathing / DRYVIT / Interior Framing / Drywall / Acoustical Ceilings

Prince Street Elementary
Prince Street Elementary

Exterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Acoustic Ceiling / Top of Wall Sealant Conditions -- This project was a combination of upgrades to the existing structure, and new additions to the structure, lasting more than 12 months.

project manager - mike white

project manager - GARY FEEHELEY

Harrington Casino
Harrington Casino

Metal Stud Framing / Insulation / Drywall / Acoustical Ceilings / Millwork / Bath Partitions & Accessories / Doors & Hardware

Ocean Downs Casino
Ocean Downs Casino

Metal Stud Framing / Sheathing / Insulation / E.I.F.S. / Drywall

Belmont Towers
Belmont Towers

Metal Studs & Trusses / Rough Carpentry / Sheathing / Insulation / Drywall / Acoustical Ceilings / Vinyl Soffit System

Adagio Condominiums
Adagio Condominiums

Metal Studs & Trusses / Exterior Sheathing / Interior Metal Stud Framing / Drywall & Access / Insulation / Acoustical Ceilings / Vinyl Soffits / Carpentry / Doors & Hardware / Column Covers / Bath Accessories / Entertainment Centers

Chesapeake College Eastern Shore
Chesapeake College Eastern Shore

Higher Education Center Exterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Specialty Wood Panel Acoustical Ceilings -- This project was new construction and lasted approximately 9 months.

Merck Pharmaceutical
Merck Pharmaceutical

Exterior Metal Framing / Exterior Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Specialty Doors & Frames / Stainless Steel Walls & Plates / Integrated Wash-Down Trims / Acoustical Ceilings / DRYVIT Systems -- This project has been ongoing for more than 20 years.

Peninsula Regional Medical Center
Peninsula Regional Medical Center

Exterior & Interior Metal Stud Framing / Exterior Sheathing / Drywall / Conventional Plaster / Concrete Sidewalks & Patching / Metal Roof & Siding / DRYVIT Systems / Stainless Steel Walls & Plates / Specialty Interior Items for Medical Setting / On-Call Services -- This project and associated work has been ongoing for over 30 years.

Stephen Decatur High School
Stephen Decatur High School

Exterior metal framing / sheathing / drywall / metal stud interior framing / insulation / acoustical ceilings / acoustical wall panels / specialty pipe grid ceiling for production lighting -- This 12-month project was a combination of existing structure with upgrades and new additions to the old structure.