Check out some of our past and current projects that we are working on.
Questions? Call us at (302) 436-2611.
PROJECTS
Cape Henlopen High School
Exterior Framing / Sheathing / Drywall / Stud Interior /Framing / GFRC Panels -- Project lasted 12 months, which also included insulation, exterior framing and metal trusses.Capital School District Admin. Bldg.
Exterior Framing / Sheathing / Metal Trusses / Interior Wall Framing -- Project lasted nearly 12 months.Beebe Medical Center
Numerous projects in and around the main campus and satellite locations. Includes MRI Rooms / CT Scan Rooms / General Contracting, etc. -- K.B. Coldiron, Inc. and Mike White have been working with Beebe for more than 14 years.Methodist Manor House
Multiple projects including renovations to the interior of the property -- This project is ongoing, and has been active for more than six years.First State Chevrolet
Exterior Framing / Plywood Sheathing / AVB / ACM Panels / Painting / Acoustical TilesShow More
North Salisbury Elementary School
Exterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Acoustical Ceiling / Fire Proofing -- This project was all-new construction, and lasted approximately 12 months.Intervet, Inc. Office Building
Exterior Framing /Sheathing / DRYVIT / Interior Framing / Drywall / Acoustical CeilingsPrince Street Elementary
Exterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Acoustic Ceiling / Top of Wall Sealant Conditions -- This project was a combination of upgrades to the existing structure, and new additions to the structure, lasting more than 12 months.Show More
project manager - mike white
project manager - GARY FEEHELEY
Harrington Casino
Metal Stud Framing / Insulation / Drywall / Acoustical Ceilings / Millwork / Bath Partitions & Accessories / Doors & HardwareShow More
Chesapeake College Eastern Shore
Higher Education CenterExterior Metal Stud Framing / Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Specialty Wood Panel Acoustical Ceilings -- This project was new construction and lasted approximately 9 months.
Merck Pharmaceutical
Exterior Metal Framing / Exterior Sheathing / Drywall / Metal Stud Interior Framing / Insulation / Specialty Doors & Frames / Stainless Steel Walls & Plates / Integrated Wash-Down Trims / Acoustical Ceilings / DRYVIT Systems -- This project has been ongoing for more than 20 years.Peninsula Regional Medical Center
Exterior & Interior Metal Stud Framing / Exterior Sheathing / Drywall / Conventional Plaster / Concrete Sidewalks & Patching / Metal Roof & Siding / DRYVIT Systems / Stainless Steel Walls & Plates / Specialty Interior Items for Medical Setting / On-Call Services -- This project and associated work has been ongoing for over 30 years.Show More
Stephen Decatur High School
Exterior metal framing / sheathing / drywall / metal stud interior framing / insulation / acoustical ceilings / acoustical wall panels / specialty pipe grid ceiling for production lighting -- This 12-month project was a combination of existing structure with upgrades and new additions to the old structure.Show More